1Challenge

It was necessary to carry out construction and installation work on the installation of KSO-2-10, vacuum circuit breakers, ShSN-10, as well as to install reclosers, AISKUE metering devices and put into operation switching station-10 kV in the Kochkor and Balykchy points, since it is necessary to ensure reliable power supply to the customer's facilities.

2Solution

Construction and installation works were carried out in switching station-10 kV "Kochkor" and "Balykchy": installation of KSO-2-10 (21 pcs.), installation of KSO-2-10 cells (13 and 8 pcs), installation of vacuum circuit breakers (6 pcs), installation and installation of ShSN-10 (2 pcs), installation of reclosers (3 pcs), installation of AISKUE metering devices (3 sets), laboratory tests, commissioning, a connection order was received and commissioning was carried out.

3Scope of work

  1. 1Construction and installation works in the Kochkor РП-10 кВ
  2. 2Installing КСО-2-10
  3. 3Cell Mounting КСО-2-10 13 Cells
  4. 4Installation of vacuum circuit breakers 4 pcs
  5. 5Installation and installation of ШСН-10
  6. 6Construction and installation works in the Balykchy РП-10
  7. 7Installing КСО-2-10
  8. 8Mounting Cells КСО-2-10 8 Cells
  9. 9Installation of vacuum circuit breakers 2 pcs
  10. 10Installation and installation of ШСН-10
  11. 11Cell Mounting КСО-2-10 13 Cells
  12. 12Installation of vacuum circuit breakers 4 pcs
  13. 13Installation of Reclosers 3 pcs
  14. 14Laboratory tests
  15. 15Commissioning
  16. 16Installation of the AISKUE metering device
  17. 17Getting a Connection Order
  18. 18Commissioning
4

Result

The customer received fully installed and used equipment, confirmed by tests, connected to the 10 kV network and put into operation, which provides the required power supply.

Equipment and materials

Equipment designations are given exactly as in the as-built documentation.

  • КСО-2-10 21 pcs
  • Vacuum circuit breakers 6 pcs
  • ШСН-10 2 pcs
  • Steel strip 50 * 438 m
  • Metering device3 sets

Next project

Transfer of compact packaged substation on the municipal territory at 10 Tynaliev Street

Contact us

Ready to discuss your project?

An engineer’s site visit and initial consultation are free.We prepare a commercial proposal within 24 hours.