Transfer of compact packaged substation on the municipal territory at 10 Tynaliev Street

Transfer of compact packaged substation on the municipal territory at 10 Tynaliev Street

Bishkek city, Tynaliev street 10
2026 год 5 мес
Client: ОсОО "Большая Земля"
Cable line installationSubstation installationSubstation dismantlingTransformers

1Challenge

To move the existing compact packaged substation-10 kV from the municipal territory at 10 Tynaliev Street, having received all the necessary technical conditions, urban planning conclusions and approvals, as well as to ensure the connection of a new compact packaged substation without disconnecting neighboring consumers.

2Solution

TU and ITU were obtained for the transfer and installation of a new compact packaged substation-10 kV, development and approval of projects, pouring of foundations, soil preparation, pulling of the APvBPu-10 3*185 cable, installation and installation of new compact packaged substation-10 kV, transformers TSL-160 and TSL-630, counter. grounding, laboratory tests, commissioning, installation of AISKUE metering devices and obtaining orders for connection.

3Scope of work

  1. 1Obtaining technical specifications for the transfer of the existing ТП-10 кВ 160 кВ
  2. 2Development of a detailed design
  3. 3Development of a town-planning conclusion for the transfer of compact packaged substation
  4. 4Obtaining an ITU for transfer
  5. 5Coordination of the project with the relevant services
  6. 6Obtaining technical specifications for the installation of a new ГКТП-10кВ 630 кВ
  7. 7Development of a detailed design
  8. 8Obtaining a town-planning conclusion for the installation of a new ГКТП-10кВ
  9. 9Obtaining an engineering and technical condition (ITU)
  10. 10Coordination of the project with the relevant services
  11. 11Pouring the foundation for compact packaged substation -10 kV 160 kVA
  12. 12Excavation of soil for КЛ-10кВ and grounding, Backfilling of the cable and grounding Pulling the cable АББПлУ-10 кВ,
  13. 13Installing a new ГКТП-10кВ 160кВ
  14. 14Installation ГКТП-10 кВ
  15. 15Installation of counter grounding ГКТП-10
  16. 16Installing ТСЛ-160 кВ and 10/0.4kV
  17. 17Installation ТСЛ-160 кВ a 10/0.4kV
  18. 18Dismantling ГКТП-10 кВ and transformer ТМ-160кВ a
  19. 19Laboratory tests
  20. 20Commissioning
  21. 21Installation of the AISKUE metering device
  22. 22Getting a Connection Order
  23. 23Commissioning
  24. 24Pouring the foundation for ГКТП-10кВ 630 кВ a
  25. 25Excavation of soil for КЛ-10кВ and grounding
  26. 26Pulling the cable АББПлУ-10 кВ
  27. 27Cable backfill and grounding and layer-by-layer tamping
  28. 28Installing ГКТП-10кВ
  29. 29Installation ГКТП-10 кВ
  30. 30Installation ТСЛ-630 кВ a 10/0.4kw 2 pcs
  31. 31Installation ТСЛ-630 кВ a 10/0.4kV
  32. 32Installation of counter grounding ГКТП-10кВ
  33. 33Laboratory tests
  34. 34Commissioning
  35. 35Installation of the AISKUE metering device
  36. 36Getting a Connection Order
  37. 37Commissioning
4

Result

The customer received new compact packaged substation-10 kV with TSL-160 and TSL-630 transformers, all tests and connection were completed without disconnecting neighboring consumers.

Equipment and materials

Equipment designations are given exactly as in the as-built documentation.

  • Cabinet ГКТП-10 (РУ-10, 3 cells, transit)2 sets
  • Transformer ТСЛ-160 10/0,41 pc
  • Transformer ТСЛ-630 кВ A 10/0.4kV 2 pcs
  • Cable АПвБПу-10 3*18590 m
  • Cable Coupling 3КНТП-10 120-2406 Sets
  • Steel strip 50*475 m
  • Metering device2 sets

Next project

Transfer of VL-10 kV from F-1 substation-35/10kV Novo-Pokrovka

Contact us

Ready to discuss your project?

An engineer’s site visit and initial consultation are free.We prepare a commercial proposal within 24 hours.