Routine repair at the 110/10 kV Karier substation
1Challenge
Ensure reliable and safe operation of the 110/10 kV Karier substation through routine equipment repair and elimination of identified defects.
2Solution
The condition of the substation equipment was inspected and diagnosed;
The identified defects were repaired: worn components were replaced, and the equipment was adjusted and cleaned;
Protective and switching devices were tested for proper operation;
Commissioning was carried out after the repair.
Result
The 110/10 kV Karier substation has been fully restored and is ready for safe operation;
The risk of accidents and power outages has been reduced;
Reliable equipment operation and a stable power supply to connected consumers are ensured.
Ready to discuss your project?