Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells

24 Ibraimov St., Bishkek (Uchkun OJSC)
2025
Substation installationSubstation replacement

1Challenge

Provide a reliable and safe power supply to the facility by installing a transformer substation, laying a 10 kV cable line and installing K-59 KRU-10 switchgear cells for power distribution.

2Solution

Design and preparatory work for installing the transformer substation and the cable line;

Installation of the transformer substation in line with capacity and safety requirements;

Laying of the 10 kV cable line in compliance with electrical installation standards;

Installation of K-59 KRU-10 switchgear cells for distribution and protection of the power network;

Commissioning and verification of the system for compliance with standards.

3

Result

The facility receives a stable, safe and uninterrupted power supply;

The KRU-10 switchgear cells provide efficient power distribution and network protection;

The system fully complies with regulatory requirements and is ready for operation, with room for further capacity expansion.

Gallery

Project gallery

Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells — photo 1
Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells — photo 2
Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells — photo 3
Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells — photo 4
Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells — photo 5
Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells — photo 6
Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells — photo 7
Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells — photo 8
Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells — photo 9
Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells — photo 10
Installation of a transformer substation, laying of a 10 kV cable line and installation of K-59 KRU-10 switchgear cells — photo 11

Next project

Installation of a transformer substation and laying of a 10 kV cable line to power an EV charging station

Contact us

Ready to discuss your project?

An engineer’s site visit and initial consultation are free.We prepare a commercial proposal within 24 hours.