1Challenge

Provide the EV charging station with a reliable and sufficient power supply by installing a transformer substation and laying a 10 kV cable line from the connection point to the site.

2Solution

A full scope of work to build and commission the power supply system, including:

- installation of a 10 kV, 2500 kVA transformer substation;

- laying of a 10 kV cable line from the existing grid to the substation;

- installation of distribution and protection equipment;

- connection of the charging station to the low-voltage side of the substation;

- commissioning and preparation of as-built documentation.

3

Result

The charging station receives a stable, uninterrupted power supply that meets capacity and reliability requirements, ensuring full operation of the chargers, safe use and the possibility of expanding the station in the future.

Gallery

Project gallery

Installation of a transformer substation and laying of a 10 kV cable line to power an EV charging station — photo 1
Installation of a transformer substation and laying of a 10 kV cable line to power an EV charging station — photo 2
Installation of a transformer substation and laying of a 10 kV cable line to power an EV charging station — photo 3
Installation of a transformer substation and laying of a 10 kV cable line to power an EV charging station — photo 4
Installation of a transformer substation and laying of a 10 kV cable line to power an EV charging station — photo 5

Next project

Relocation of a transformer substation

Contact us

Ready to discuss your project?

An engineer’s site visit and initial consultation are free.We prepare a commercial proposal within 24 hours.