Installation of compact packaged substation-10kV on its own territory on the street and power transmission line-10kV on Zhail Baatyr Street 13
1Challenge
It was necessary to install compact packaged substation-10kV on its own territory at 13 Zhail-Baatyr Street and connect to power transmission line 10kV, including obtaining all the necessary technical and urban planning approvals.
2Solution
Technical specifications, urban planning conclusion and technical specifications, detailed design development, coordination with services, soil preparation, laying of AABPL-10 cable, pouring of the foundation, installation of compact packaged substation-10kV, installation of dry power transformer, cabinet cells, counter-grounding, SV-105 support, M-3 traverses, insulators SHV-10, wires A-50 and SIP-3, installation of RLND-10kV, connection to transformer substation-10 and VL-10, laying of CL-0.4kV, installation of the RU-10/0.4kVcabinet, laboratory tests, commissioning, obtaining a work order, installation of the AISKUE metering device and commissioning.
Result
The customer received a fully commissioned facility with an installed compact packaged substation-10kVconnected to power transmission line 10kV, tests carried out and documents executed.
Ready to discuss your project?
An engineer’s site visit and initial consultation are free.We prepare a commercial proposal within 24 hours.